Please use this identifier to cite or link to this item: https://repositori.uma.ac.id/handle/123456789/23632
Title: Evaluasi Rehabilitasi Jalan Secara Long Segment pada Ruas Jalan Genting Gerbang – Sp, Uning
Other Titles: Evaluation of Long Segment Road Rehabilitation on the Genting Gate - Sp, Uning Road
Authors: Akbar, Said Fadillah
metadata.dc.contributor.advisor: Rangkuty, Nuril Mahda
Keywords: jalan;kerusakan;perkerasan lentur;evaluasi;penanganan;road;damage;flexible pavement;evaluation;handling
Issue Date: 19-Aug-2023
Publisher: Universitas Medan Area
Series/Report no.: NPM;188110015
Abstract: Jalan Genting Gerbang – Sp,Uning, Kecamatan Genting Gerbang, Kabupaten Aceh Tengah, Provinsi Aceh Sta 0+000 s/d 2900+300 adalah salah satu jalan yang menghubungkan Kecamatan Genting Gerbang dengan Kecamatan Linge. Pada kondisi eksisting jika dilihat secara visual adanya beberapa titik kerusakan. Maka dari itu perlu dilakukan penelitian sejauh mana tingkat kerusakan jalan tersebut. Penelitian kerusakan Jalan Genting gerbang – Sp, Uning menggunakan Metode Pavement Condition Index (PCI) dan Metode Bina Marga. Adapun tujuan dari penelitian ini adalah untuk mengetahui jenis-jenis kerusakan permukaan perkerasan lentur dan besar nilai PCI serta penilaian dan penanganan yang tepat terhadap kerusakan pada perkerasan lentur menggunakan Metode Bina Marga. Berdasarkan hasil evaluasi pada jalan Genting Gerbang – Sp,Uning sepanjang 3 km dengan lebar jalan 4m. Dari hasil penelitian dapat diketahui nilai PCI dari Sta 0+000 s/d 2900+300 mendapatkan nilai 72,5 termasuk dalam klasifikasi kualitas good, dapat melakukan penanganan dengan cara pemeliharaan rutin, dan berdasrkan hasil evaluasi pada jalan Genting gerbang – Sp,Uning sepanjang 3 km dengan lebar jalan 4m. Dari hasil penelitian dapat diketahui nilai Metode Bina Marga dari Sta 0+000 s/d 2900+300 mendapatkan nilai 2,66. Dan hasil PCI 72,5 yang menunjukan jalan masih dalam kualitas baik. Genting Road - Sp, Uning, Genting Gate District, Central Aceh Regency, Aceh Province Sta 0+000 to 2900+300 is one of the roads that connects Genting Gate District with Linge District. In the existing condition, if you look at it visually, there are several points of damage. Therefore, it is necessary to research the extent of the damage to the road. Research on damage to Genting Gate Road - Sp, Uning uses the Pavement Condition Index (PCI) Method and the Bina Marga Method. The aim of this research is to determine the types of flexible pavement surface damage and the PCI value as well as the appropriate assessment and treatment of damage to flexible pavement using the Bina Marga Method. Based on the evaluation results on the Genting Gate – Sp, Uning road which is 3 km long with a road width of 4 m. From the research results, it can be seen that the PCI value from Sta 0+000 to 2900+300 gets a value of 72.5, which is included in the good quality classification, can be handled using routine maintenance, and is based on the results of evaluations on the Genting Gate - Sp, Uning road along 3 km with a road width of 4m. From the research results, it can be seen that the value of the Highways Method from Sta 0+000 to 2900+300 gets a value of 2.66. And the PCI result is 72.5 which shows the road is still in good quality.
Description: 79 Halaman
URI: https://repositori.uma.ac.id/handle/123456789/23632
Appears in Collections:SP - Civil Engineering

Files in This Item:
File Description SizeFormat 
188110015 - Said Fadillah Akbar - Fulltext.pdfCover, Abstract, Chapter I, II, III, V, Bibliography2.17 MBAdobe PDFView/Open
188110015 - Said Fadillah Akbar - Chapter IV.pdf
  Restricted Access
Chapter IV417.05 kBAdobe PDFView/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.