dc.description.abstractThe role of Construction Management in Applying Project is very importanr to get succcsfull project To get the good quality, finishing job faster then the time determined and the economical cost are hoped by every construction company or pason active in this job. The applying good method can effect the duration of applying job, to get these aims. The Construction Method and the Duration of Project Construction are very unponant in managing project. Their funcuons are as a pilot in projectt construction. Beside that, the Construction Method or Time Schedule have become a requirement in Managing the offer of Project they also have high quality in winning the offer of Project.en_US
dc.language.isoenen_US
dc.publisherUniversitas Medan Areaen_US
dc.subjectManagementen_US
dc.subjectConstructionen_US
dc.titlePengaruh Metode Pelaksanaan terhadap Durasi Pelaksanaan Pekerjaan (Studi Literature)en_US
dc.typeThesisen_US
Appears in Collections:SP - Civil Engineering

Files in This Item:
File Description SizeFormat 
008110013_File1.pdfCover277.87 kBAdobe PDFView/Open
008110013_File2.pdfAbstract279.84 kBAdobe PDFView/Open
008110013_File3.pdfIntroduction676.63 kBAdobe PDFView/Open
008110013_File4.pdfChapter I390.81 kBAdobe PDFView/Open
008110013_File8.pdfReference352.79 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.