Title: Analisis Produktivitas Tukang Pada Proyek Pekerjaan Konstruksi
Authors: Nurasyiah, Ilfah
Keywords: Productivity;Salary;Labour;Linear Function Graph
Issue Date: 21-Mar-2009
Abstract: Labour’s productivity is one of important factor in construction project. By this productivity data, contractor can do some repair for the planning of the project, both of the time of execution or the cost of execution project, and this is one one of the step to handle some troubles that will raising up in each type of work in a construction project. The excellent goal from this research is to analysied the labour’s productivity, which this is based the fact that most contractor not respect to their labour’s productivity, which this can influence the successful of the final project. This was caused because of the uneffective use of labour, such us too much free time, talking, eating, drinking and take a cigarette while the working time. Analysies for this productivity began from the brick installation until plaster the wall. The conclusion is the productivity of every labour is different to each other. The labour’s productivity in brick installation are 0.714; 1.143; 3.535; 0.761 and 1.428 while the value for plastering the wall that are 2.285; 1.714; 2.714; 3.428 and 2.571
URI: https://repositori.uma.ac.id/123456789/396
Appears in Collections:SP - Civil Engineering

Files in This Item:
File Description SizeFormat 
078110045_file1.pdfCover240.77 kBAdobe PDFView/Open
078110045_file2.pdfAbstract217.04 kBAdobe PDFView/Open
078110045_file3.pdfIntroduction225.43 kBAdobe PDFView/Open
078110045_file4.pdfChapter I224.68 kBAdobe PDFView/Open
078110045_file5.pdfChapter II262.47 kBAdobe PDFView/Open
078110045_file6.pdfChapter III417.13 kBAdobe PDFView/Open
078110045_file8.pdfEnclousure1.25 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.