Search
Add filters:
Use filters to refine the search results.
Results 1-6 of 6 (Search time: 0.003 seconds).
- previous
- 1
- next
Item hits:
Issue Date | Title | Author(s) | ???itemlist.dc.contributor.advisor??? |
---|---|---|---|
2000 | Model Tarif Interkoneksi Antar Operator Telekomunikasi (Studi Kasus PT. Telkom Divre I Sumatera) | Purwanto | Harahap, Zaibun; Banjarnahor, M |
2000 | Peramalan Permintaan Gas Elpiji Di Pertamina Depot Epiji Tandem | SP, Mhd. Fauzy | - |
14-Mar-2000 | Metode Jaringan Kerja pada Proyek Pembangunan Perumahan Perum Perumnas | Basuki, Muhammad | - |
Jun-2000 | Penerapan Quality Control Circle (QCC) dalam Pengendalian Mutu Roller Ductile pada Seksi Machining di PT. Growth Asia (Foundry) Medan | Sukidi | Singh, Raspal; Batubara, Akri Adil |
Jul-2000 | Analisa Network Planning pada Pembangunan BTS Halat PT. Satelindo Medan | Hariandi, Yusuf | Haniza |
2000 | Pengendalian Persediaan Bahan Baku Utama PT. Flora Sawita Chemindo Tanjung Morawa Medan Sumatera Utara | Riduan | Harahap, Zaibun; Mustafa, Kamil |