Title: Pengendalian Pengawasan Pembangunan Kantor Bupati Toba Samosir
Other Titles: Controlling Supervision of Construction of the Toba Samosir Regent's Office
Authors: Sijabat, Wallensetein W.
metadata.dc.contributor.advisor: Arifin, Zainal
Chamrialsyah
Keywords: pengawasan pembangunan;development supervision
Issue Date: Aug-2001
Publisher: Universitas Medan Area
Series/Report no.: NPM;988110031
Abstract: Di dalam pelaksanaan suatu proyek konstruksi akan melibatkan beberapa pihak (baik Pemilik, Konsultan. Kontraktor) sehingga selalu menimbulkan banyak pembahan-perubahan yang terpdi, perubahan itu akan terus berlangsung selama umur proyek baik pada masa persiapan/pra pelaksanaan, masa pelaksanaan dan penyelesaian akhir. Untuk mengendalikan perubahan-perubahan itu hams dibuat suatu sistern pengendalian ag::tr proyek dapat terlaksana dengan baik, misalnya dalarn hal pengendalian pengawasan proyek yang mernerlukan tenaga-tenaga ahli di bidangnya rnasing-masing. Untuk keperluan pengendalian ini, penyusunan paket-paket pekerjaan (Work Breakdown Structure) clan struktur organisasi (Organization Breakdown Structure) yang jelas dan terp e:-inci dalam suatu proyek sangat diperlukan. Untuk menunjang hal tersebut mab seorang manager proyek harus mengetahui dasardasar dalam pengendalian pengawasan seperti yang diuraikan pada Bab II Dalam pelaksanaannya seorang manager harus memegang prinsip "rnenempatkan orang yang tepat pada tempatnya clan pada waktu yang tepat",. Penyampaian informasi/laporan dini yang terperinci dari masing-masing pengawas lapangan, waktunya harus sesingkat mungkin, karena informasi/laporan ini dapat membantu pihak manajemen Konsultan Pengawas dalam mengendalikan pelaksanaan pe•1gawasan proyek tersebut.. Dengan menerapkan hal di atas. diharapkan mampu meminimalisasi Penyimpangan- penyimpangan yang terjadi di dalam suatu proyek. Sehingga mutu pro: ek yang dicapai sesuai dengan yang tertuang di dalam spesifikasi teknis dokumen kontrak). In the implementation of a construction project will involve several parties (both Owners, Consultants, Contractors) so it always creates a lot the changes that occur, these changes will continue throughout the life of the project both during the preparation/pre-implementation period, the implementation period and final completion. To control these changes must be made an ag::tr project control system can be implemented well, for example in terms of project supervision control that requires expert personnel in their respective fields. For the purposes of this control, preparation of work packages (Work Breakdown Structure) and organizational structure (Organization Breakdown A clear and detailed structure in a project is very necessary. For To support this, a project manager must know the basics in supervisory control as described in Chapter II In practice, a manager must adhere to the principle of "placing people in the right place and at the right time." Delivery detailed early information/reports from each field supervisor, The time should be as short as possible, because this information/report can help Supervisory Consultant management in controlling implementation supervision of the project.. By implementing the above. is expected to be able to minimize Deviations that occur in a project. So quality pros: the results achieved are in accordance with those stated in the technical specifications contract documents).
Description: 61 Halaman
URI: https://repositori.uma.ac.id/handle/123456789/22462
Appears in Collections:SP - Civil Engineering

Files in This Item:
File Description SizeFormat 
988110031 - Wallenstein W.Sijabat - Fulltext.pdfCover, Abstract, Chapter I, II, III, V, Bibliography15 MBAdobe PDFView/Open
988110031 - Wallenstein W.Sijabat - Chapter IV.pdf
  Restricted Access
Chapter IV938.64 kBAdobe PDFView/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.