Title: Produktivitas Berat Pekerjaan Pengaspalan Jalan Toguda dari Jembatan Batang Gadis ke Perumahaan Staim Kecamatan Penyabungan Kabupaten Mandailing Natal
Other Titles: Productivity Heavy Equipment Work of Asphal Walke Toguda of Bridge Bar Girl to Staim District of Panyabungan Sub-Province of Mandailing Natal
Authors: Fahmi, Khairul
metadata.dc.contributor.advisor: -
Keywords: pengaspalan jalan;road paving
Issue Date: 2008
Publisher: Universitas Medan Area
Series/Report no.: NPM;068110036
Abstract: Dalam laporan tugas akhir ini penyusunan membahan masalah produktivitas alat berat pekerjaan pengaspalan jalan toguda dari jembatan batang gadis ke perumahan Staim. Adapun data yang diperoleh dalam penulisan tugas akhir ini, dengan cara melakukan penelitian lapangan pada proyek pengaspalan jalan toguda darijembatan batang gadis ke perumahan Staim pada PT. Sinar Batang Natal. Proyek yang berada di Kee. Penyabungan dimulai pada tanggal 25 Desember 2007 dan berakhir 25 Juni 2008 dengan nilai kontrak Rp. 1.301.500.000. Alat-alat yang digunakan pada pekerjaan pengaspalanjalan tersebut adalah: 1. Dump Truck, perhitungan jumlah dump truck dalam mengoperasikannya disesuaikan dengan kapasitas AMP. AMP berada di daerah aek pohon, sipolupolu dengan jarak 2o km. pada proyek ini dipergunakan 5 dump truck dengan kapasitas dump truck 1, 524 ton/jam. 2. asphalt finisher, yang berfungsi untuk menghamparkan material, untuk mendapatkan lapisan yang merata. Kapasitas dari asphalt finisher adalah 14, 133 ton/jam. 3. Tandem Roller, berfungsi untuk mendapatkan permukaan yang lebih rata dan lebih halus dengan cara pemadatan, yaitu pemadatan awal dan pemadatan akhir, kapasitas tandem roller adalah 33, 079 ton/jam. 4. Pneumatic Tired Roller, sering disebut juga mesin gilas roda ban. Roda-roda pengilas ini terdiri dari roda-roda karet yang diisi angin, roda muka dan roda belakang disusun selang seling sehingga bagian yang tidak tergilas oleh roda muka akan digilas oleh rada belakang. Pada waktu menggilas roda-roda harus dibasahi dengan air agar tidak menempel pada ban. Kapasitas pneumatic tired roller adalah 20, 60 ton/jam. Maka kombinasi alat yang digunakan memenuhi syarat untuk mendapatkan pemadatan yang baik. Yang menjadi acuan pada pekerjaan tersebut adalah dump truck. In this final buty report compiler study the problem of heavy equipment productivity work of paving walke toguda of girl bar bridgen to housing of Staim. As for data which is obtained in writing of this final duty, is way of doing/conducting research of field project of asphalt walke toguda of girl bar bridge to housing of Staim PT. SINAR BA TANG NATAL. Project of residing in kec. Panyabungan, started on 25 December 2007 and end 25 June 20Q8 with value contract Rp. 1.301.500.000. appliances which is used at work of the road; street asphalt : 1. Dump Truck, tally of truk dump in operating adapterd for by capacities of AMP. AMP reside in area of aek tree of Sipolu-Polu with distance 20 km. 5 truck dump with capacities of dump truck 1,524 ton I [hour/clock] 2. Asphalt Finisher, functioning to carpet material, to get coat which flatten. Capacities of Asphalt Finisher is 14, 133 ton I [hour/clock] 3. Tandem Roller, functioning to get more surface tlatten and softer by condensation, that is condesation early artd final condesation. Tandem Roller Capacities is 33, 079 ton I [hour/clock]. 4. pneumatic Tired Roller, Often referred as also machine run over tire wheel. Wheels of Penggilas this consist of filled rubber wheels with wind, face wheel and wheel behind compiled after interlude so that part of which do not be run over by face wheel will be run over by wheel behind. When running over wheels have to wett with water in order not to patch tire. Capacities of Pneumatic Tired Rolle is 20, 60 ton/ [hour/clock]. Hence up to standard used appliance combination to get good condensation. Which become reference at the work is truck dump.
Description: 33 Halaman
URI: https://repositori.uma.ac.id/handle/123456789/21205
Appears in Collections:SP - Civil Engineering

Files in This Item:
File Description SizeFormat 
068110036 - Khairul Fahmi - Fulltext.pdfCover, Abstract, Chapter I, II, III, V, Bibliography2.33 MBAdobe PDFView/Open
068110036 - Khairul Fahmi - Chapter IV.pdf
  Restricted Access
Chapter IV580.16 kBAdobe PDFView/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.